It takes practically a 1500 m2 shed to store some of the material necessary for the GEMAB. Signs, barrels, barriers, pipes, a real arsenal that needs to be maintained regularly, especially as the next edition approaches. It is a real winter job that the logistic team takes care of with full devotion. The next step will be to refurbish the balloon equipment before the new 2023 season. There’s never a dull moment on the Chambley airfield, on the E and G hangar sides.
![Hangar G – Pilâtre de Rozier Organisation](https://www.pilatre-de-rozier.com/wp-content/uploads/2014/08/Hangar-G-Pilâtre-de-Rozier-Organisation.jpg)